2017 Sidewalk Repair and Reconstruction Summary

URL: https://data.bloomington.in.gov/dataset/27e0cf1d-2528-4534-a83c-45cb500d5850/resource/d5cf1d34-2429-4127-a967-e99fec711766/download/2017-sidewalk-repair-and-reconstruction.csv

A summary of all the concrete sidewalk repair and reconstruction projects that occurred during 2017. This includes work done in association with the City's Sidewalk Assistance Program, as well as general maintenance, repair and reconstruction to sidewalk segments, driveway entrances, curbs and ramps

This summary includes all projects that were completed both by City of Bloomington Street Department crews and those that were performed by personnel from Groomer Construction, which was contracted by the City of Bloomington to assist with sidewalk and ramp repair work in 2017.

This resource view is not available at the moment. Click here for more information.

Download resource

Additional Information

Field Value
Data last updated February 6, 2018
Metadata last updated March 13, 2017
Created March 13, 2017
Format text/csv
License Open Data Commons Public Domain Dedication and License (PDDL)
createdover 2 years ago
formatCSV
has viewsTrue
idd5cf1d34-2429-4127-a967-e99fec711766
last modifiedover 1 year ago
mimetypetext/csv
on same domainTrue
package id27e0cf1d-2528-4534-a83c-45cb500d5850
position1
revision id567ce52c-6ae1-4614-a6f5-0bb7e6d9267e
stateactive
url typeupload