-
2019 City of Bloomington Paving Schedule
A detailed project listing of the planned street paving activities that are scheduled for 2019. -
Facilities Maintenance Division Annual Statistics
The Facilities Maintenance Division of the Public Works Department is responsible for sustaining the quality and functionality of the City of Bloomington’s buildings and... -
2020 City of Bloomington Paving Schedule
A detailed project listing of the planned street paving activities that are scheduled for 2020. An interactive map showing all the scheduled 2020 paving projects, per estimated... -
Street Division Annual Statistics
The Street Division of the Public Works Department provides maintenance and repair for the City of Bloomington’s approximately 238 lane miles of streets. It is tasked with... -
Fleet Maintenance Division Annual Statistics
The Fleet Maintenance Division of the Public Works Department is responsible for the safe and efficient maintenance and repair, as well as the distribution of unleaded and... -
Board of Public Works Annual Statistics
Annual statistics about the accomplishments (per task) of the Board of Public Works. Data collection began in 2018. -
2018 Sidewalks, Curbs and Accessible Curb Ramps Condition Assessment
The City of Bloomington contracted with a firm to conduct a citywide survey of street pavement conditions. As part of this effort, real-time conditions regarding sidewalks,... -
Tree Trimming & Upkeep Activity
A summary of tree trimming and upkeep work orders that have been conducted by the Street Division on trees located in the public right-of-way. This includes pruning, limb and... -
Street Lights
A summary of street light repairs and replacement work orders that have been conducted by the Public Works Department. Data goes back to when the City's current asset... -
Potholes: Public Requests to Fill a Pothole
Open311 reports of potholes from uReport. This is a subset of the Open311 data. This data is now hosted on our new Socrata data portal....