2018 Sidewalks, Curbs and Accessible Curb Ramps Condition Assessment
The City of Bloomington contracted with a firm to conduct a citywide survey of street pavement conditions. As part of this effort, real-time conditions regarding sidewalks,... -
2019 City of Bloomington Paving Schedule
A detailed project listing of the planned street paving activities that are scheduled for 2019. -
2020 City of Bloomington Paving Schedule
A detailed project listing of the planned street paving activities that are scheduled for 2020. An interactive map showing all the scheduled 2020 paving projects, per estimated... -
Potholes: Public Requests to Fill a Pothole